Power outage
hi, i've just implemented a 3 node hyper v csv/ failover cluster , working good.
i need implement power outage plan should power go out in our buildings extended length of time.
i use apc smart 3000 ups's allow me install agents on servers , shut them down when battery reaches level.
i'm thinking best plan install these on 3 hosts , san, once batteries have 10/ 15 mins left action hosts shut down, san shut down.
however, how can set vm's go saved state straight away , not try , fail on host?
cheers
apc have version of powerchute software hyper-v.
http://www.apc.com/products/resource/include/techspec_index.cfm?base_sku=sspcnshv&tab=features
sean
Windows Server > Hyper-V
Comments
Post a Comment