Clustering question


in active-passive 2 node windows 2008 cluster currently in production use, added 2 new drives , it's showing under available storage.

how can add these 2 new drives sql server dependencies? please let me know

thanks.


sqldev

the recommendation before adding new storage cluster ensure passes cluster validation storage tests. these include disk failover tests

when cluster validation performed on configured cluster, if default tests (which include storage tests) selected, disk resources in offline state or not assigned clustered service or application used testing storage. builds in safety mechanism, , cluster validation wizard warns when storage tests have been selected but not run on storage in online state, is, storage used clustered services or applications. design avoid disruption highly available services or applications depend upon these disk resources being online.

http://technet.microsoft.com/en-us/library/cc771259.aspx#diskfailover

http://technet.microsoft.com/en-us/library/cc732035(v=ws.10).aspx



Windows Server  >  High Availability (Clustering)



Comments

Popular posts from this blog

CRL Revocation always failed

Failed to query the results of bpa xpath

0x300000d errors in Microsoft Remote Desktop client